Need some experienced eyes on a CenterPoint Energy billing issue. The meter nameplate shows 400:5 but the billing system has 200:5. Compared the interval data against the bill and found TOU allocation doesn''t match meter timestamps.
Evergy won''t budge on backbilling limits — need advice
Be careful with Kentucky Utilities''s refund process — they sometimes try to limit the lookback period to 5 years.
Irene D, you should also check the rider calculations while you''re at it. These errors tend to cluster.
Good work Fiona M. For the folks following along, this is a textbook example of why we check power factor penalties on every audit.
Don''t forget to check the Rate LP effective dates — DTE Energy backdated a rate change that caught me off guard.
Be careful with Xcel Energy''s refund process — they sometimes try to limit the lookback period to 6 years.