Wanted to share a lesson learned from a recent PSE&G audit. The utility''s position is that the meter was configured correctly, but the tariff language doesn''t support that. We pulled 48 months of billing history and found the load factor miscalculation started in 2023.
Question about Georgia Power voltage discounts
This is exactly why I always pull 24+ months of history. The pattern wouldn''t show in a shorter window.
Nice find. I''ve started using the AAUBA audit workbook to cross-reference these calculations and it saves a ton of time.
Don''t forget to check the Rate GV effective dates — Portland General Electric backdated a rate change that caught me off guard.
Welcome insights here. I''d add that ConEd''s billing system has had known issues with estimated reads since their platform migration. Document everything carefully.