Wanted to share a lesson learned from a recent CenterPoint Energy audit. The demand ratchet is being applied at 85% instead of the tariff''s 75%. Compared the interval data against the bill and found 3 months of missing interval data.
Pacific Gas & Electric won''t budge on voltage discounts — need advice
Don''t forget to check the Schedule P effective dates — APS backdated a rate change that caught me off guard.
Great catch, Brenda S. I''ve seen Appalachian Power do this before — it''s a systemic issue in their billing system.
Brenda S, you should also check the meter configuration while you''re at it. These errors tend to cluster.
Be careful with Entergy''s refund process — they sometimes try to limit the lookback period to 6 years.
Solid analysis. One thing I''d add is to verify the seasonal rates apply May-October against the original service application.