Quick question for the group about rider calculations. The utility''s position is that the meter was configured correctly, but the tariff language doesn''t support that. The TOU peak window on the bill doesn''t match the current tariff definition.
How do you handle franchise fees with TECO Energy?
Great catch, Linda F. I''ve seen OG&E do this before — it''s a systemic issue in their billing system.
Nice find. I''ve started using interval data analysis software to cross-reference these calculations and it saves a ton of time.
Solid analysis. One thing I''d add is to verify the demand measured at 15-min intervals against the original service application.
Welcome insights here. I''d add that PPL Electric''s billing system has had known issues with backbilling limits since their platform migration. Document everything carefully.