Wanted to share a lesson learned from a recent Southern California Edison audit. The meter nameplate shows 200:5 but the billing system has 200:5. We pulled 18 months of billing history and found the CT ratio mismatch started in 2024.
$15,700 refund from APS — here''s how
Albert M, you should also check the meter configuration while you''re at it. These errors tend to cluster.
Pro tip: ask for the billing determinant detail, not just the bill summary. The devil''s in the details with National Grid.
Great catch, Albert M. I''ve seen Ameren Missouri do this before — it''s a systemic issue in their billing system.